Hong Kong Baptist Hospital

Operation room floor renovation work.

Hong Kong Baptist Hospital

Baptish Hospital was planning to renovate an operation room on the basement floor. The client required a super flat flooring finishing and at the same time, there was a very high humidity at the substrate during the site working period.

We proposed our ARDEX WPM300 as a damp proof membrane and ARDEX K15 as the super flat self-levelling compound. Final floor finishing to be rubber flooring sheet.

This ARDEX Engineered Solution not only solve the problem at this site situation, it also speed up the floor installing work by 3 days.