Situaion

Main contractor requested a quick dry, quick cure and quick set materials for patching up carpark flooring and level up the wall area.

Solution

ARDEX WPM 300 water based epoxy working as a primer which can withstand rising damp and enhance the bonding. ARDURAPID formulation  in both ARDEX A45 and ARDEX A46 allowing fast-track installation work.

ARDEX B12 provides a find smooth finish over both concrete and render. Thickness from feather edge to over 10mm. Quick setting allows further finishing materials to be applied on the top in days.