ARDEX solved floor defects for Disneyland.

Disneyland Hollywood Restaurant

Disney Hong Kong invited ARDEX Hong Kong to investigate the conditions of their reconstituted stone floor tiles in the Hollywood Restaurant. They kept on rectifying those defective floor tiles every 4 to 6 months. They did a number of tests which resulted that the waterproofing membrane was performed well.

After investigation by ARDEX, we shared with the client that the defects were mainly caused by the moisture rising from screed, tile adhesive and as  well the grout.

We proposed the whole flooring system with our ARDURAPID™ formulation which means the material would be dried by chemical reaction but NOT evaporation.

Therefore, the newly installed floor tiles will not be affected by the rising moisture anymore.